The deadline for principal accountable persons (PAPs) to register high-rise residential buildings with the Building Safety Regulator passed on 1 October 2023.
Hochiki Europe is tackling the challenge of detecting and responding quickly to a potential fire head-on with its ESP open protocol range of analogue addressable fire detection products.
Around 50 firefighters were called to respond to a flat fire on the 11th floor of a high-rise in Coventry on 30 September caused by an e-bike battery setting alight.
Andrea White, Fire Engineer and Managing Director of AW Fire, told delegates that the gap between building complexity and competence in fire safety was increasing at IOSH’s Fire Risk Management Conference in September.
If you would prefer to no longer receive the IFSEC Insider Fire Briefing, please click here.
Alternatively, to contact our data services team to have your details updated or removed entirely from our database please email imdatateam@informa.com.
This email was sent to you by the Informa Markets division of Informa PLC. Informa PLC's registered office is 5 Howick Place, London SW1P 1WG. Registered in England and Wales. Number 3099067.