Rejil Kumar, the general manager of Weathermaker FZE (WML FZE) – a Voltas Limited subsidiary – responds to frequently asked questions on MEP prefabrication, providing clarity on whether prefabricated modules add to the load of a building’s structure, affects seismic performance, and takes into consideration the delicate nature of the post-tensioning slab |
| | | Click on the image to access the digital edition of the MEP Middle East magazine today! |
| | | Buildwells International will handle the supply of sanitary wares, such as water closets, washbasins and linear drains for Azizi’s Riviera |
| | | The $108mn Nukus wind project marks the Republic of Uzbekistan’s first open, competitive tender in the wind energy sector |
| | | The demand from the construction industry, rapid urbanisation, and the rising number of high-rise buildings are contributing factors |
| | | The DMC infra project includes developing networks for deep sewage, stormwater, fire, irrigation, potable water, telecommunication, and roads |
| | VIDEO: Unlock insights with informative panel discussions |
| | | |